CASEYandEMILY.com
Home ] Adventure ] Backpacking ] Food ] Events ] Projects ] PJ and E-Ling ]

 

Ridge Vent: May 2007

After spending agonizing hours cleaning out the attic, installing the ridge vent was much easier, taking only a few hours one afternoon.  However, it was a bit more nerve racking since I was cutting a long hole into a 1-year old roof.  But I was glad to have the ridge vent when we started the kitchen remodel and the new stove location put the new hood vent right into a ceiling stud.  Reframing for the vent was not difficult, but it was a pain getting tools and materials up and down.

Here is a left-over piece of the ridge vent.

 

This is section of the lower ridge over the front bedroom, it doesn't have a ridge vent.

 

Here I've placed the left-over ridge vent on the ridge above the front bedroom.

 

This is the installed vent along the main ridge of the house.

Home ] Adventure ] Backpacking ] Food ] Events ] Projects ] PJ and E-Ling ]